The Challenge
Evaluating and mitigating noise and vibration from a planned extension of the DART light rail transit system, which was adjacent to two recording studios.
The Strategy
HMMH conducted noise and vibration measurements outside and inside the studios. The results were used to predict and evaluate noise and vibration levels from future rail operations and to develop appropriate mitigation measures.


