The Challenge
The potential noise and vibration impacts needed to be examined at a TV station, located along the corridor of a new rail line.
The Strategy
As part of the environmental impact assessment for the rail line, HMMH performed noise and vibration tests at the studio. The results were used to predict and evaluate potential noise impact at the studio from future rail operations.


